Maria Anna Gartner
Dipl.-Ing. Dr. Maria Anna Gartner
Institute of Production and Logistics
Location Feistmantelstraße 4, 1180 Wien
Email maria.gartner@boku.ac.at
Tel: +43 1 47654-73415
Projects
0 Projects found.
Publications
Knowledge Transfer to Society
Media
Presentations
Year: 2020 - Capacity planning of a mixed-model assembly line for prefabricated housebuilding elements
Autoren: Huka, MA; Grenzfurtner, W; Zauner, B; Gronalt, M
Event: ISM 2020 International Conference on Industry 4.0 and Smart Manufacturing
Year: 2019 - Scheduling and loading problem for multiple, identical dry kilns
Autoren: Huka, MA; Rindler, C; Gronalt, M
Event: 30the European Conference on Operational Research EURO 2019
Year: 2018 - Kombinierte Absatz- und Produktionsplanung in der Säageindustrie: Modelle und Implementierung
Autoren: Kaltenbrunner, M; Huka, MA; Gronalt, M;
Event: 6. Fachtagung Entscheidungsunterstützung in der Logistik (EULOG)
Year: 2018 - Optimization Models of Floorboard Toplayer Assembly
Autoren: Kaltenbrunner, M; Huka, MA; Gronalt, M
Event: 29th European Conference on Operational Research 2018
Year: 2017 - Dry kiln scheduling regarding the integrated value chain problem for sawmills
Autoren: Huka, MA; Carle, MA; D'Amours, S; Rönnqvist, M
Event: IFORS - 21st Conference of the International Federation of Operational Research Societies
Year: 2017 - Aggregated and detailed production planning for the sawing industry
Autoren: Kaltenbrunner, M; Huka, MA; Gronalt, M;
Event: IUFRO Division 5 Conference, SWST 60th International Convention 2017
Year: 2017 - Log Yard Logistics
Autoren: Huka, MA; Gronalt, M
Event: IUFRO Division 5 Conference, SWST 60th International Convention 2017
Year: 2016 - Model development and comparison of different heuristics for the production planning in large volume softwood sawmills
Autoren: Huka, MA; Gronalt, M
Event: IUFRO Division 3 Doctoral Student Conference
Year: 2016 - Log Yard Logistics
Autoren: Huka, MA; Gronalt, M
Event: IUFRO Division 3 Doctoral Student Conference
Year: 2015 - Model and solution method for an integrated value chain problem for sawmills
Autoren: Huka, MA; Carle, MA; D'Amours, S; Rönnqvist, M
Event: FIBRE 3rd Conference
Year: 2015 - Production planning with heuristics and MIP model solution considering different planning horizons
Autoren: Huka, MA; Gronalt, M
Event: CORS/INFORMS International Conference
Year: 2015 - Optimizing the short term multi-period production planning at a German sawmill
Autoren: Huka, MA; Gronalt, M
Event: VCO Summer School on big Data in Value Chain Optimization
Year: 2015 - Model and solution method for an integrated value chain problem for sawmills
Autoren: Huka, MA; Carle, MA; D'Amours, S; Rönnqvist, M
Event: 16th Symposium for Systems Analysis in Forest Resources SSAFR 2015
Year: 2015 - Dealing with a divergent production structure at a sawmill - Comparing different solution approaches
Autoren: Huka, MA; Gronalt, M
Event: 27th European Conference on Operational Research EURO 2015
Year: 2014 - Optimizing the log yard assignment problem given different diameter distributions and volumes
Autoren: Huka, MA; Gronalt, M
Event: 20th Conference of the International Federation of Operational Research SocietiesIFORS 2014
Year: 2014 - Maximizing the performance at a sawmill with optimization models and simple heuristics
Autoren: Huka, MA; Gronalt, M
Event: Workshop on OR in Agriculture and Forest Management
Year: 2013 - Optimizing the production planning at a sawmill with linear programming and simple heuristics
Autoren: Huka, MA; Gronalt, M
Event: International Conferenceon Operations Research OR 2013
Year: 2013 - Short term multi-period production planning at a sawmill – a comparison of different optimization models with simple heuristics
Autoren: Huka, MA; Gronalt, M
Event: INFORMS Annual Meeting 2013
Year: 2013 - The box assignment problem in log yards
Autoren: Huka, MA; Rathke, J; Gronalt, M
Event: EURO Mini-Conference Graz-2013
Year: 2012 - Smart Value Chain Wood
Autoren: Huka, MA; Gronalt, M
Event: COST Workshop Green Engineering Camp GEC 2012
Year: 2012 - Scheduling of Wood drying chambers
Autoren: Huka, M., Rindler, C., Gronalt, M.
Event: IUFRO Conference Division 5 2012 - Forest Products 2012
Year: 2012 - The Box Assignment Problem in Log Yards
Autoren: Huka, MA; Rathke, J; Gronalt, M
Event: 2nd Biennial International Conference on Processing Technologies for the Biobased Products Industries PTF BPI 2012
Year: 2011 - Process improvement on a log yard using double and single stage problem solving
Autoren: Huka, MA; Rathke, J; Gronalt, M
Event: Young Academics' Management Science YAMS 2011